Hangzhou Gateway, China
In February 2017, Hangzhou Gateway, a striking new office tower in Hangzhou, China, was completed.
Designed by JDS Architects, the 16-storey building incorporates two massive voids that are cut diagonally through it. The resulting ‘H-shape’ creates a stepped park on top and an arched pathway for pedestrians beneath, linking both sides of the building with a historical market hall, currently undergoing renovation, a public green space.
With a concave plan, the walkway divides the lower floors of the 23,600 sq. m building into two quarter-circle plans.
The main structural supports are provided by two vertical circulation spaces which brace the lower floor plates. These two cores are spanned by the middle floor plates like a simple beam, which creates a stable platform for the upper floors.
On top, the void in the roof creates a green park with a series of stepped terraces, a feature that the architects say is a reference to the ancient Chinese rice-field landscapes. The opening is oriented so as to provide office workers with maximum sunlight and views. The staggered terraces also retain rainwater, which is used to assist with the building’s cooling.
Content and imagery courtesy of JDS Architects.
Photography is by Julien Lanoo.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.